OSHA Regulation – 3106-01R 1998 – Concrete and Masonry Construction

This manual prescribes performance-oriented requirements designed to help protect all construction workers from the hazards associated with concrete and masonry construction operations at construction, demolition, alteration, or repair worksites.

Love this item?

Download For Free

Subscribe to download this item, and get 14 days of unlimited downloads - for free!


Start 14-Day Free Trial

Download FREE!

To download OSHA Regulation – 3106-01R 1998 – Concrete and Masonry Construction today just enter your email address!

By purchasing or downloading this product you are agreeing to our terms and conditions.

Contributor - Files

Full Description

The Occupational Safety and Health Administration’s standard for concrete and masonry constructionβ€” Subpart Q, Concrete and Masonry Construction, Title 29 of the Code of Federal Regulations (CFR), Part 1926.700 through 706β€”sets forth requirements with which construction employers must comply to protect construction workers from accidents and injuries resulting from the premature removal of formwork, the failure to brace masonry walls, the failure to support precast panels, the inadvertent operation of equipment, and the failure to guard reinforcing steel.

Subpart Q prescribes performance-oriented requirements designed to help protect all construction workers from the hazards associated with concrete and masonry construction operations at construction, demolition, alteration, or repair worksites. Other relevant provisions in both general industry and construction standards (29 CFR Parts 1910 and 1926) also apply to these operations.

Reviews

There are no reviews yet

Be the first to review “OSHA Regulation – 3106-01R 1998 – Concrete and Masonry Construction”